Status Closed
TCC/WTP/GM/001 2258-BHU
Project Manager (PIU), District Municipality
tccpiuadb@gmail.com
Phone: +975.02.335947
Fax: +975.02.335944
June 16, 2011
July 29, 2011
| Date | : | 16 June 2011 |
| Loan No. | : | 2258-BHU: Urban Infrastructure Development Project |
| Contract No. and Title | : | TCC/WTP/GM/001: Design, Build, Supply, Install, Operate and Transfer Water Treatment Plant at Megoipang, Thimphu, Bhutan |
| Deadline for Bid Submission | : | 29 July 2011; 14:00 hours |
1. The Kingdom of Bhutan has received a loan from Asian Development Bank (ADB) towards the cost of Urban Infrastructure Development Project. Part of this loan will be used for payments under the contracts named above. Bidding is open to all eligible ADB member countries. However, a successful bidder is required to register with the Construction Development Board (CDB) of Bhutan (within ONE Month from the Letter of Acceptance) before award of contract.
2. The Thimphu District Municipality, RGoB (the “Employer”) invites sealed bids from eligible bidders for the Design, Build, Supply, Install, Operate and Transfer Water Treatment Plant at Megoipang, Thimphu, Bhutan (“the Work”).
3. Only eligible bidders with the following key qualifications should participate in this bidding:
4. The Procurement will be done through International Competitive Bidding (ICB) in accordance with ADB’s Single-Stage: One-Envelope Bidding Procedure.
5. To obtain further information and inspect the bidding documents, bidders should contact the office of:
Project Manager (PIU), District Municipality
Post box- 215, NPPF building
Telephone No: 975- 02-335947
Fax: 975- 02-335944
e-mail: tccpiuadb@gmail.com
6. The documents can be purchased from the office of Project Manager mentioned above by paying a pay a non-refundable fee of Nu 10,000/- or USD 225/ by cash/draft between 09:00 hours and 17:00 hours on any working day from 16th June till 27th July 2011.
7. To purchase the bidding documents in English, eligible bidders should:
8. A Pre-Bid Meeting will be held on 8th July 2011 from 14:00 hrs at the Conference Hall of Ministry of Works & Human Settlement.
9. The bids should be delivered.
The bids will be opened immediately after the deadline for submission for bid submission in the presence of bidders’ representatives who choose to attend.
The above is a complete copy of the original procurement notice.
1. The Kingdom of Bhutan has received a loan from Asian Development Bank (ADB) towards the cost of Urban Infrastructure Development Project. Part of this loan will be used for payments under the contracts named above. Bidding is open to all eligible ADB member countries. However, a successful bidder is required to register with the Construction Development Board (CDB) of Bhutan (within ONE Month from the Letter of Acceptance) before award of contract.
2. The Thimphu District Municipality, RGoB (the “Employer”) invites sealed bids from eligible bidders for the Design, Build, Supply, Install, Operate and Transfer Water Treatment Plant at Megoipang, Thimphu, Bhutan (“the Work”).