• Organization TypeGoods Supplier, Service Providers
  • HeadquartersOman

Ad-Dhahirah Generating Company

About IBRI IPP project is developed to meet the increasing demands of electricity in the Sultanate of Oman. The Owner of the project is Ad-Dhahirah Generating Company, a consortium of ACWA Power, Mitsui & CO. and DIDIC. Oman Power and Water Procurement Co.(SAOC) is the client for IBRI IPP project. The site for the development of IBRI IPP is located in an inland undeveloped, greenfield site, adjacent to route 21 (Buraimi-Ibri highway) with an area of 25.9 ha . The scope of the Projects includes the design, engineering procurement, construction, erection, commissioning and operation of a high efficiency combined cycle gas fired power generation facility with a capacity of 1,516.5 MW at Reference Conditions. The Contractor will be required to make available 985.5 MW of Early Power at Reference Conditions by 1 April 2018, and full capacity of between 1516.5 MW.  
See more

Company Offices

  • Oman (headquarters)
  • Muscat
  • Muscat Grand Mall, Floor.
  • PO BOX:164,