Investor Green Gvozd d.o.o. performs measurements of wind energy potential within Krnovo area since 2009. at locations of Gvozd and Jeinjak. Based on these measurements it is concluded there is wind energy potential which can be technically exploited.
Wind power plant Gvozd is planned to be constructed south of the existing wind power plant Krnovo, at locations between Gvozd and Obešenjak, Oštrica, Bovec, Mašina, Jajin, Grakala and Vlaško brdo.
Within the area of the wind power plant investor plans construction of internal underground mid-voltage 33 kV cable network, optical cable network and transmission lines for purpose of connection wind turbines to the new substation 33/110 kV Gvozd.
For the transport of wtg components it is planned reconstruction of the existing roads and the construction of new roads between wind turbines. In addition to the traffic infrastructure, the construction of crane pads is also planned, as well as the foundations with earthing.
The connection of the wind power plant Gvozd to the 110 kV high voltage network will be achieved by construction of a new substation SS 33/110 kV Gvozd and the reconstruction of the existing substation SS 33 / 110kV Krnovo, interconnected by a new 110 kV transmission line Gvozd-Krnovo.