The history of Hunan Xiangjiang Electric Power Construction Group Co., Ltd. ("Xiangjiang Electric Power Group") can be traced back to 1989. It was established in 2007 with a registered capital of 151.8 million yuan. It is a thermal power plant of various grades (including coal, gas, and gas). Fuel oil, waste heat, etc.), wind power stations, solar power stations, garbage power stations, biomass power stations, nuclear power stations and auxiliary production facilities, transmission and transformation lines of various voltage levels, and the EPC construction of the overall engineering of substations, mainly involved in the construction of electric power and A large-scale comprehensive construction group in various fields such as financial investment, survey and design, special equipment installation, machinery manufacturing, and infrastructure construction.
The company is one of the few in the country with national power engineering construction general contracting level 1, electric power installation (repair, test) level 1, power industry design level (transmission engineering, substation engineering), construction mechanical and electrical installation professional level, A large-scale private enterprise with more than 20 power-related qualifications, including the first-level foundation engineering major, the first-level boiler installation, renovation and maintenance level, the pressure pipeline installation (GB1, GB2, GC1, GCD level), and the operating qualifications for foreign contracting projects. . It can provide domestic and foreign customers with power industry chain solutions and full life cycle services from project feasibility studies to investment and financing, exploration, planning, design, procurement, construction, commissioning, operation and maintenance.
Leading technology
The company has strong construction force and complete mechanical equipment. It has 6 wind turbine tower cranes with a full coverage of various wind turbines with a rated lifting capacity of 135t and a hub height of less than 180m. It has 1,500 (sets) of various advanced machinery and equipment. The total equipment power reaches nearly 8000 kilowatts, the original value of fixed assets such as machinery and equipment reaches 300 million yuan, and it has the large-scale crane equipment, transportation equipment and advanced debugging and testing at home and abroad required for the simultaneous construction of a number of large-scale comprehensive projects. Professional equipment.