Tanahu Hydropower Limited
Tanahu Hydropower Limited
About

Tanahu Hydropower Limited (THL) is a subsidiary company of Nepal Electricity Authority (NEA) established in 2012 to develop 140 MW Tanahu Hydropower Project ("the Project") (formerly, Upper Seti (Damauli) Storage Hydroelectric Project). The Project site is situated 150 km west of Kathmandu on Seti River near Damauli of Tanahu District in Gandaki Zone. The project is a storage type plant capable of supplying peak power for minimum of 6 hours daily. The power will be evacuated through a 40 km long 220 kV double circuit transmission line to New Bharatpur sub-station. 

The Project is situated on Seti river of Vyas municipality near Damauli, the district headquarter of Tanahun District. Eight VDCs and Vyas municipality of Tanahun district are directly affected by the project. The estimated cost of the Project is US$ 505 million.
 
 
Read more

Type of organization

1 office
Similar organizations
Government of Grenada
1 open position
World Trade Organization (WTO)
1 open position
1 open position

Company Offices

  • Nepal (headquarters)
  • Kathmandu
  • Trade Tower Building, 4th Floor Thapathali, Kathmandu